Is there a time of year when scaffold cannot go on the road?
During the annual bonfire celebrations, the East Sussex Highways licence terms allow no scaffolding on the highway at all. If your job falls near one of those evenings, ask the scaffolder what the terms mean for your road and choose a start that sits clear of them. Working from a drive avoids the restriction altogether, since scaffold on private ground falls outside the highway licence.
Who checks a Ringmer re-roof?
The Planning Portal sets two limits for roof work. Stay under 25 per cent of the building envelope and under 50 per cent of the roof, and a building control application is not normally needed. Weight changes the picture: a new covering heavier by 15 per cent or more calls for approval, and the Planning Portal suggests you let a structural engineer or surveyor judge, ahead of any work, whether the timbers will bear the extra load. Lewes District Council can tell you which team handles building control for your address. Our roof replacement page explains how a full re-cover is planned, stripped and re-laid, with the access, waste and daily plan explained to you.
On a village road, neighbours matter as much as paperwork. The houses either side hear from us before the poles arrive and again before they leave, and the footway is kept passable. Waste is bagged and taken off the site at the end of each day, so the verge and the lane stay tidy. The survey is where we decide where materials sit, which gutters need protecting and how the chimney is reached.