When a Gossops Green repair becomes a re-roof
Matching repairs seldom involve forms; a larger job can bring in Crawley Building Control and a highway licence.
Resetting a few loose tiles, bedding a ridge afresh or relining a worn valley leaves the house looking unchanged. Work that leaves the outside appearance unchanged is not counted as development, so a like-for-like repair rarely means a form. Things change once the job grows into a re-roof, once the covering itself is different, or once poles must go up on the public footway.
How big can a Gossops Green repair get before approval is needed?
In Crawley Building Control's own list, work on more than 25% of a roof's surface, repair or replacement, is something it must approve, and Gossops Green falls under that service. The Planning Portal frames the national test another way: normally no application if less than 25 per cent of the building envelope and less than 50 per cent of the roof is affected. Extra load is its own trigger: a covering 15 per cent or more heavier needs approval, and the Planning Portal advises checking with a surveyor or structural engineer beforehand. When a survey points towards a whole slope, Crawley Building Control hears from us before any date is fixed, and their reply is noted on the written price. Our roof replacement page sets out how a complete re-cover is staged.